Projects

Project Info Tab

image

  • Define general info about the project.
  • Code,Name,Company and Bom cannot be null.
  • Produce button opens a production slip with the projects information.

Estimated Cost Tab

image

  • Estimated cost shows the cost of the projects bom at desired date.

Actual Cost Tab

image

  • Actual cost tab shows the slips and dispatches we created for this project to how much it costs actually.

Items Tab

image

  • Items tab shows the items needed to produce the project and the items we have to warn if we dont have enough items.
In this document